US$ 200.00
Sliding roof
DETAILS This buffer light adds a realistic red stop light to any siding
Blue and Grey
can be built with or without paint
and wave pattern teeth
376-277 LNER Thompson Brake Second Corridor BR Maroon No. E16857E Weathering Sliding roofEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 200.00
US$ 165.00
US$ 328.00
US$ 180.00
US$ 180.00
US$ 180.00
US$ 300.00
US$ 180.00
US$ 300.00
US$ 160.00
US$ 450.00
US$ 110.00
US$ 160.00
US$ 360.00
US$ 340.00
US$ 325.00
US$ 750.00